Considerable portion of our work is taken by planning manufacturing buildings in which individual steps in car manufacturing take place.
The technical design of the foundation for the main and auxiliary...
The new Body Construction Hall H4a with its 120.000 sq metres was built...
The High-rack Storage is the highest building in the Volkswagen factory in Bratislava.
The Car Body Construction hall H4c for the new vehicle segment was built on an area...
The new Assembly Hall was planned and built with a structure similar to that of the new car body...
Extension of the paint shop for the new vehicle segment New Small Family is...